Report agricultural boilers and pressure vessels by Nov. 30

Reading Time: < 1 minute

Published: November 18, 2021

Report agricultural boilers and pressure vessels by Nov. 30

The deadline for owners and operators of existing agricultural boilers and pressure vessels (BPVs) to report their BPV devices is November 30, 2021. Devices can be reported to the Technical Standards and Safety Authority (TSSA) on its website.

This deadline, which followed the Information Order issued in October, gives agricultural owners and operators an additional 60 days to report existing BPV equipment installed before July 1, 2021. 

Submission of the equipment reporting form is an important first step. TSSA needs basic information to do a site risk assessment and establish a priority list for scheduling the inspection to be conducted within five years. Priority for inspections will be given to agricultural operations with high-risk sites. 

Read Also

Senior Editor John Greig talks about some of the larger industry trends around Canada's Outdoor Farm Show 2025.

Wrap up: What are the big industry trends heard at Canada’s Outdoor Farm Show?

Senior Editor John Greig talks about some of the larger industry trends heard around Canada’s Outdoor Farm Show 2025.

The TSSA says sites will receive a notification one month before the inspection date. If your devices are exempt from the regulation under O. Reg. 220/01 s.2, there will be no fee associated with the inspection. 

To reschedule the inspection, contact [email protected] or your local inspector. 

For more information on TSSA’s BPV regulatory requirements, visit Agricultural Operations – Boilers and Pressure Equipment

explore

Stories from our other publications